PHITSCRAFT

BUILD LOG

How this is built.

A reverse-chronological record of what has been completed. Updated as work lands.

  • Platform - Antigravity + Cursor

    Deploy chain stabilized

    All sites deployed as independent repositories. Git remotes, Vercel projects, and production branches configured and verified end-to-end.

    2026-05-23
  • Infrastructure - All lanes

    Studio restructured

    Phitscraft Studio reorganized into six flat departments: creative, dev, ops, marketing, planning, personale_forening. AI-agnostic playbooks established for all departments.

    2026-05-22
  • Platform - Cursor

    Terra Archive live

    terra-archive.com launched. Terminal-style interface built with boot sequence, filtered log viewer, and Sanity-driven content pipeline.

    2026-05-01
  • Platform - Cursor

    Phitscraft.com launched

    phitscraft.com live. Publisher portal with hero, series overview, notes feed, and Sanity integration.

    2026-05-01
  • Narrative - Claude

    Ascended Fase A - all drafts complete

    DL-001 through DL-018 drafted. Archive cleaned. Canon structure for Fase A established.

    2026-04-07
  • Narrative - Claude

    Evolved - Kapitel 1 structure complete

    Kelly established as character. Scene structure for Kapitel 1 and 2 defined. First six scenes drafted.

    2026-04-06
  • Narrative - Claude

    DL-000 approved

    First data log - Empty Parameters - drafted and canon-approved. The opening record of Anthropologist-24.

    2026-04-01
  • Foundation - Claude

    Signal Lead built

    Core editorial and narrative direction established for Terra: Ascended. The format, voice, and diegetic constraints defined.

    2026-03-25

Build log updated manually. Automation planned for a later phase.